Archive for the ‘2012 Olympics’ Category

East London Line will open on 14th May 2010

Monday, April 12th, 2010

- Trains every 5 minutes between Dalston Junction and Surrey Quays
- 20 new trains
- Four new stations

The East London will be finished on time and within budget and will open on 14th May 2010. The trains that will begin service are brand new, airy and comfortable. Each of the carriages is properly air-conditioned. The stations look absolutely fantastic.

The new line’s most sensational feature, the brand new station at Shoreditch High Street, sits entombed in a developer’s cocoon, so that when the economy picks up, flats, businesses and shops can be built around and upon it.

The East London Line will plug South Hackney into the tube system with connections at Highbury and Islington and Whitechapel. Whitechapel will become the key transport hub in central east London as the Crossrail will pass through it.

Findlay Property’s roving photographer captured the new trains going through some trial runs:

Haggerston Station

Haggerston Station with Haggerston park behind

East London Line looking south towards the canal from Haggerston

East London Line looking south

2012 Olympics Site - Progress

Thursday, November 19th, 2009

The London Olympics site is dramatcially taking shape and many of the buildings are nearing completion.

The roof of Aquatics Centre (designed by celebrity architect Zaha Hadid) has been successfully lifted and lowered into place. The design of the roof is inspired by the fluid geometry of water in motion

The first of 11 residential plots in the Olympic Village has been structurally completed and the Olympic Stadium is looking very impressive


73 Broadway Market, London E8 4PH. Company registration number 476 8476.
Blog powered by WordPress Entries (RSS) and Comments (RSS).